Press Releases April 22, 2026 08:30 AM

Standard Lithium Reaches Major Operational Milestones at Arkansas Demonstration Plant

Standard Lithium achieves key operational milestones in Arkansas demonstrating robust lithium extraction technology and safety record

By Sofia Navarro SLI
Standard Lithium Reaches Major Operational Milestones at Arkansas Demonstration Plant
SLI

Standard Lithium Ltd. has reached significant operational milestones at its Arkansas Demonstration Plant, processing 1 million barrels of real-time brine and completing over 15,000 cycles using commercial-scale direct lithium extraction technology. The plant achieved high lithium recovery rates and zero safety incidents over six years, highlighting process reliability and safety excellence. This progress supports scalability and de-risking of their South West Arkansas Project, strengthening their position in U.S. lithium production.

Key Points

  • Processed 1 million barrels of live brine from the Smackover Formation, validating real-time extraction capabilities.
  • Completed over 15,000 DLE cycles achieving over 95% lithium recovery and 99% contaminant rejection, demonstrating technology effectiveness.
  • Maintained zero safety incidents during 340,000 man-hours of operation over six years, underscoring operational excellence and safety commitment.
  • Processed 1 million barrels of brine, pumped in real-time from the Smackover Formation
  • Completed 15,000 cycles of DLE using the same process to be implemented at the South West Arkansas Project
  • 6 years and 340,000 man hours of operation without a safety incident

VANCOUVER, British Columbia, April 22, 2026 (GLOBE NEWSWIRE) -- Standard Lithium Ltd. (“Standard Lithium” or the “Company”) (TSXV: SLI) (NYSE.A: SLI), a leading near-commercial lithium company, is pleased to announce the achievement of several meaningful operational milestones at its large-scale Demonstration Plant (the “demo plant” or “facility”) in El Dorado, Arkansas. The demo plant contains a fully operational brine-to-lithium carbonate flowsheet, and at its core is a commercial-scale direct lithium extraction (“DLE”) unit supplied by Aquatech.

Since its initial commissioning in 2020, the facility has now reached three significant milestones:

  • Standard Lithium has processed 1 million barrels (42 million gallons, or 160 million litres) of real brine, pumped in real-time from the Smackover Formation;
  • The core DLE technology to be used at the South West Arkansas Project (the “SWA Project”) (with initial capacity of 22,500 tonnes of annual battery-quality lithium carbonate) has now successfully completed over 15,000 cycles, demonstrating the fundamental performance targets of 95%+ lithium recovery and 99%+ rejection of key contaminants; and
  • The experienced team of operators, technicians, laboratory specialists and engineers have completed roughly 340,000 man hours during the six years of operation, and have done so with zero incidents, underscoring Standard Lithium’s strong commitment to operational safety and best practices.

“These achievements at our demo plant, which is the first of its kind and remains the only continuously operating facility in the Smackover Formation that processes real-brine in real-time to achieve high levels of lithium recovery, high levels of contaminant rejection and makes battery-quality lithium carbonate, reflect years of technical advancement and disciplined execution by our team in Arkansas,” said Dr. Andy Robinson, President and Chief Operating Officer of Standard Lithium. “Processing and analyzing such large volumes of live lithium brine provides a unique and robust data set that supports the scalability and de-risking of our selected process technology. It also strengthens our first mover advantage in the Smackover Formation, having the only shovel-ready project in the area preparing to take a Final Investment Decision. Just as importantly, we have achieved these exceptional results while maintaining an exemplary safety record, which speaks to the quality and experience of our operations and our people.”

The demo plant will continue to serve as a critical platform for process flowsheet optimization, operational data collection, engineering design input and employee training to de-risk commissioning of the SWA Project.   Additionally, insights gained from long-term operations will further support future project development and strengthen the Company’s approach to sustainable lithium production in the United States.


Figure 1: Operators at control panel in front of commercial-scale (8’ x 4’) DLE column at Standard Lithium’s Demonstration Plant near El Dorado, Arkansas.

About Standard Lithium Ltd.

Standard Lithium is a leading near-commercial lithium development company focused on the sustainable development of a portfolio of large, high-grade lithium-brine properties in the United States. The Company prioritizes projects characterized by high-grade resources, robust infrastructure, skilled labor, and streamlined permitting. Standard Lithium aims to achieve sustainable, commercial-scale lithium production via the application of a scalable and fully integrated DLE and purification process. The Company’s flagship projects are located in the Smackover Formation, a world-class lithium brine asset, focused in Arkansas and Texas. In partnership with global energy leader Equinor, Standard Lithium is advancing the SWA Project, a greenfield project located in southern Arkansas, and actively advancing a promising lithium brine resource position in East Texas.

Standard Lithium trades on both the TSX Venture Exchange (“TSXV”) and the NYSE American under the symbol “SLI”. Please visit the Company’s website at www.standardlithium.com for more information.

Investor Inquiries
Daniel Rosen
+1 604 409 8154
[email protected]

Media Inquiries
[email protected]

X: @standardlithium
LinkedIn: https://www.linkedin.com/company/standard-lithium/

Neither the TSXV nor its Regulation Services Provider (as that term is defined in policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe, “expect”, “plan”, “forecast”, “may”, “could”, “should”, “schedule”, “predict”, “budget”, “project”, “potential” and other similar words or expressions identify forward-looking statements or information. These forward-looking statements or information may relate to the Company’s ability to continue operations at the demo plant, the demo plant’s ability to serve as a critical platform for process flowsheet optimization, operational data collection, engineering design input and employee training to de-risk commissioning of the SWA Project, the demo plant’s ability to further support future project development, the ability and timing of any advancements at the SWA Project, including towards a Final Investment Decision, continued exploration of the resource position at the East Texas properties, future expansion phases and other factors or information. Such statements represent the Company’s current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affecting such statements and information other than as required by applicable laws, rules and regulations.

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/14bbf0d4-c22b-422a-8c20-f6c48ecabe01


Risks

  • Future project development and Final Investment Decision are subject to business, economic, competitive, political, and social uncertainties, which may delay or alter outcomes.
  • Operational scaling from demonstration to commercial scale may present unforeseen technical or financial challenges impacting execution timelines.
  • Market conditions for lithium demand and pricing volatility may affect commercial viability and project profitability.

More from Press Releases

Fiverr Announces First Quarter 2026 Results Apr 29, 2026 Nayax to Report 2026 Q1 Earnings on May 12, 2026 Apr 28, 2026 Xunlei Filed Its Annual Report on Form 20-F for Fiscal Year 2025 Apr 28, 2026 Mesoblast Achieves Patient Recruitment Target in Pivotal Phase 3 Trial for Chronic Low Back Pain Apr 28, 2026 Syntec Optics (Nasdaq: OPTX) Announces Pricing of $20 Million Underwritten Public Offering of Common Stock Apr 28, 2026